This site uses cookies to monitor the site and give you a better user experience. By using our site, you acknowledge that you have read and understand our Privacy Policy and our Terms and Conditions.
Regular inspections of power lines across Australia is required to ensure safety and proper maintenance upkeep. Powerlines and associated infrastructure should be inspected every 12-24 months. Given the geographical size of Australia, this is a costly and time-consuming task.
Challenge
The regular inspection of power lines in remote and difficult to access areas of Australia is mostly undertaken by manned helicopter. This costly exercise requires a highly skilled team of pilots and technicians working long hours in a risky environment.
Sky Division Solution
Fitting a FAZER R G2 with a camera as well as a LiDAR system will provide the inspection team with a live video feed and detailed images with geotag capability, as well as 3D LiDAR imaging of surrounding landscape for vegetation management.
Benefits
The FAZER R G2 is able fly at just 65-100 metres above the ground while guided by the satellite-assisted auto-pilot navigation system. This allows highly accurate flight plans.
UAV Benefits
Use of UAV greatly increases safety and reduces cost
FAZER R G2 can be transported via road to each site
Reducing the cost of transit time between towns by manned helicopter
FAZER R G2 can fly slower than a manned helicopter